Sewer trench

Sewer trench

They have been going great today: we have finished drilling through the foundation and the trench goes all the way from the house, under the wall, and more than half way down the street. And at the bottom of the hill we have exposed the connection to the main sewer in the Post Road and should be able to start laying pipe tomorrow 🙂

Panorama showing the trench from the house and down the hill
View up the hill with the road plates covering the opening  in the Post Road until we open it up again tomorrow

Leave a Reply

Your email address will not be published. Required fields are marked *