A full day

A full day

The sewer line is hooked up under the Post Road and all the way up into the house; the k-crete is in (special non-compressible concrete for under roadways) and they’ve started backfilling. Tomorrow they’ll finish the backfilling, cut and cap the cleanouts (the white pipes sticking up), blacktop the Post Road and hopefully switch the pipes in the house over to use this sewer line instead of the old one 🙂

Leave a Reply

Your email address will not be published. Required fields are marked *